OMIC R&D Additive Center
Construction of their new Additive Center in Scappoose, Oregon. Ward-Henshaw's scope of work included structural concrete foundations including footings, isolated slabs, and slab on grade for two pre-engineered metal buildings. One was a 20,000 sf, two-story shop area and the other a 10,000 sf one-story (lower level) office.