Stewart Lennox Reservoir
Ward-Henshaw conquered the tough rock conditions of southeastern Oregon at this remote jobsite for the Steward Lennox 1.2MG prestressed-concrete, subterranean reservoir. Scope involved the excavation of 32,000 total CY including 25,000 CY of rock. that was crushed onsite and then balanced and placed. This was a fully buried reservoir with our work including final grading and the restoration of the site within the project boundaries.