18th & Kellogg Reservoir
This ten-month project is currently under construction for the City of Kennewick. As a tank subcontractor we are constructing a new 6MG AWWA D110 Type I prestressed concrete reservoir to replace the existing demolished 10MG reservoir. Reservoir construction includes a 194’ diameter 24” (2’-0”) thick slab foundation, 31’-6” tall concrete walls, 52 columns and 10” thick roof slab. The reservoir will be completed as scheduled in August 2021.