West Slope Reservoir No. 3
The work performed included construction of a partially buried 3.0 MG pre-stressed concrete reservoir, associated appurtenances, water and storm drainage piping and connections to existing systems, rehabilitation of an existing valve vault, electrical and telemetry improvements, landscaping, and miscellaneous site work. The work also included contractor designed temporary (soil nail) and permanent (segmental block) retaining walls, 30 mil liner beneath new tank, and the demolition and disposal of the existing 2.25MG reinforced concrete reservoir.